Browse By

Boat Ramp Pathway

Concept rendering by Morgan Kirk

This little connector pathway offers Greenway users a cut through a patch of wildflowers away from the road. It would run from the top of the boat ramp to the lower ramp into the parking structure (leading to the mural) via a gentle incline. Wildflowers along the way offer shelter and food to pollinators, plentiful learning opportunities for children and adults alike, and simple beauty.

Concept idea: Morgan Kirk and Mae Humiston

Cost: $225-$300

-100ft x 6ft x 2″ deep crusher run gravel mix: $200?

-Wildflower mix: $25 from Southern Exposure Seed Exchange

Labor: 13 hours

-Cutting/leveling path: 10 hours (or 3 Ben Braman hours)

-Spreading crusher run: 2 hours?

-Spreading wildflower mix: 1 hour

Leave a Reply

Your email address will not be published. Required fields are marked *